Post Installation Testing

Post Installation Testing

Our design and installation of Gensets are supported by following measurements on commissioning of generators:
a. Anemometric measurement of air velocity at intake and discharge.
b. Exhaust and insulation temperature measurement with IR thermometer.
c. Noise level measurement.
d. Compressed air leak test on fuel lines and Load bank test on gen-sets etc..